Hamburg – Since Monday (18.03.2019) the solar park Schmerzke in Brandenburg is in operation and feeds power into the grid.

For the PV rooftop system with an installed peak power of 749.93 kWp, an annual output of 707,000 kilowatt hours is expected. This will provide around 200 households with renewable energy for one year.

After the solar park Warlow, VentusVentures brings the second solar park to the grid within a few months.